The Process Summarized
The production process (usually) takes 1 week, then the manufacturing process 4 to 6 weeks, then scheduling for the installation may take up to a 1 week, and completing the installation 2 to 3 days. Total time after site measure is (approximately) 6 to 8 weeks.