Production Process
Once we receive the required confirmation for your order, the job file is transferred to our Production Department. The technicians in our Production Department use specifically formatted software designed for cabinetmaking. Computer layouts and drawings are converted to a CAD format compatible with our construction methods including cut lists, door sizes and all of the exact measurements and details for the manufacturing process.
During the production process, purchase orders are issued for non-stock items. Depending on the workload at the time, a file generally takes 5 to 7 working days to process and be forwarded to the plant for manufacturing.